Siuslaw River Bridge East Sidewalk Closed

If you are planning on watching the fireworks from the Siuslaw River Bridge the east sidewalk remains closed for construction. The west sidewalk is open to all to enjoy the walk and the view. The Siuslaw River Bridge Protection Project has been repairing damaged concrete, applying a surface coating to protect the structure from corrosion, adding sidewalk features, installing seismic upgrades, and replacing bridge railings. Much of the project is complete.  The project is on schedule to be completed in 2019.